First MTP (Big toe) fusion - Guide wire is placedAn initial guide wire is placed across the joint to allow accurate positioning prior to fixation. A
DePuy xmm wire from the set is drilled distally and dorsally and angled just
lateral of the midline axis of the toe if possible.